Commercial electricity & natural gas833-264-7776

Commercial energy / Buyer guidance

Natural gas offer worked example: hotel operations

An explicitly hypothetical gas comparison for hotel operations: operating assumptions, fee arithmetic and contract limits.

An illustrative hotel decision

This example is independently constructed. It does not describe a customer, property or achieved result. Its purpose is to show how an operating question and a fee can change a comparison. The figures below are assumptions, not typical usage, a benchmark or a market quote.

The operating question

Separate occupied-room demand for hot water and laundry from base ventilation, refrigeration and common-area loads. A changing occupancy pattern can alter the value of a fixed-volume assumption. Use occupied room-nights alongside energy, but do not infer that a higher unit cost means the supplier made an error.

Equipment to investigate includes guestroom HVAC, domestic hot water and laundry. The main constraints to document are occupancy changes, comfort standards and event loads. A useful activity measure may be energy per occupied room-night, provided its boundary and period remain consistent. Those records help explain the account; they do not determine supplier eligibility.

State the modeled purchase

Assume annual consumption of 120,000 therms, identical start and end dates, and the same included cost components. Offer A has a flat rate of $0.62 per therm and no monthly supplier fee. Offer B has a flat rate of $0.6 per unit and $65 each month in supplier fees.

Entered component Offer A Offer B
Annual commodity amount $74,400 $72,000
Annual recurring supplier fees $0 $780
Modeled annual supply total $74,400 $72,780

The difference is $1,620 per year on the entered components. Offer B is lower in this specific model. Change the assumptions and the comparison can change. Use the offer comparison tool to reproduce the arithmetic; for a portfolio, enter the aggregate recurring fee only after checking how it is charged.

Costs and obligations outside the example

Utility delivery, demand, taxes, variable pass-throughs, deposits, promotional credits, termination and project costs are not modeled. Both agreements would need the same inclusions for the totals above to be a fair comparison. An apparently lower modeled cost is not a recommendation to sign.

For a gas offer, verify therm versus Mcf pricing, the bill heat-content basis, location and transport components, and who manages balancing or nominations. Do not treat a commodity-only price as a delivered total.

Test a change in the business

Ask what happens if occupancy, production or equipment differs from the assumed year. Read volume tolerances, minimums, assignment and site-closure terms. Identify quote validity, authorized signer, broker compensation and notice requirements. A proposed operating change must also meet safety, quality and comfort requirements.

For hotel operations, the decision record should connect the usage assumptions with occupancy changes, comfort standards and event loads. Record which assumptions are known, estimated or still awaiting records. A supplier pricing an old profile cannot be assumed to have accepted a new operating plan.

Verify an actual implementation

Retain the offer, comparison and executed agreement. Confirm enrollment and check the first invoice for the right meter, dates, units, product and fees. Explain differences in usage and billing periods before describing a lower invoice as a saving. This example makes no claim about what a real account would achieve.

Read the hotel operating guide, use the renewal planner and review the procurement playbook. Initial inquiries do not require account documents or receive calculator figures.

Context sources

EIA electricity cost components and EIA gas pricing explain broad price context. The numerical inputs and arithmetic here are independently constructed and are not attributed to those agencies as observed results.

Worked example: hot-water intensity and total gas can move differently

Hypothetical, simplified operating periods: a defined hot-water boundary uses 250 therms for 100 occupied room-nights, or 2.5 therms per room-night. A later period uses 300 therms for 150 room-nights, or 2.0 therms per room-night. Total gas rose by 20%, while the ratio fell by 20%.

This is not a benchmark or proof of an equipment improvement. Laundry arrangements, guest mix, kitchen activity, supply-water temperature and standing losses can change the result. A boiler serving both space heat and hot water also needs a boundary that distinguishes those services before an occupancy adjustment is used.

Keep temperature, recovery and guest-service requirements visible. A proposed control change cannot simply reduce hot-water service to achieve a financial target. For a real project, obtain the equipment and operating record, confirm the relevant safety requirements with qualified personnel and establish how the reporting period will be compared with baseline.

DOE boiler-system guidance illustrates system-level thermal review. The example's arithmetic is original and asserts no achieved hotel result.