Commercial electricity & natural gas833-264-7776

Commercial energy / Buyer guidance

Henry Hub to the gas meter: benchmark, basis and delivered cost

Build a delivered-gas price bridge and compare consistent energy units, with an original benchmark-plus-basis scenario.

A benchmark identifies a location and a product

Henry Hub is a natural gas benchmark location associated with traded contracts. It is not the delivered price for every commercial gas meter. A buyer needs the quoted unit, delivery period, location and settlement method before comparing a supplier offer with a Henry Hub number.

The CME contract specification identifies the futures instrument. Spot observations, a futures delivery month and a supplier's fixed retail offer are distinct. A current front-month price cannot be substituted for a customer's future twelve-month purchase without matching the delivery period and other components.

Build the delivered-cost bridge

Ask the supplier to identify benchmark commodity, regional basis, transportation, storage or balancing treatment, supplier fees and utility delivery. Some offers bundle several components; others leave named items variable. A label such as fixed gas is incomplete until the price schedule and exclusions are read.

Keep energy and volume consistent. One MMBtu equals ten therms as an energy-unit conversion, but converting cubic feet to energy requires the relevant heat-content factor. Do not assume that one Mcf is always exactly one MMBtu. Preserve the factor from the actual bill or agreed product specification.

Worked example: an energy-unit bridge with stated exclusions

Hypothetical components: benchmark commodity is $3.50/MMBtu, regional basis is $0.70/MMBtu and a supplier component is $0.30/MMBtu. The entered total is $4.50/MMBtu, equivalent to $0.45/therm. At 12,000 MMBtu annually, those components cost $54,000.

If the example also has a $200 monthly supplier fee, add $2,400, producing $56,400. This excludes utility distribution, taxes and anything else not listed. If basis is variable under the actual offer, $0.70 remains a scenario rather than a fixed commitment. All prices and quantities are invented teaching inputs, not current Henry Hub values or actual supplier charges.

Questions to ask before accepting a benchmark explanation

Question Evidence
Which benchmark and dates? Product specification and dated observation
Which location difference? Defined basis component and settlement
What does fixed include? Executed schedule and exclusions
Who manages deviations? Volume, balancing and transport clauses
Which bill units? Meter record and conversion basis

Use a benchmark to explain an exposure, not to infer a supplier's margin from two incompatible prices. A retail offer includes obligations and risks not represented by a benchmark observation alone. Ask for compensation and fee disclosures instead of inventing a standard markup.

Sources and limits

CME Henry Hub specifications identifies the instrument. EIA units supports the energy-unit distinction, and EIA gas price factors provides market context. The cost bridge is original scenario arithmetic, not a quote or guaranteed delivered cost.